Tuesday, June 8, 2010

Iberdrola Successfully Completes Syserwind Demo Wind Energy Project

Iberdrola Successfully Completes Syserwind Demo Wind Energy Project
Frozen the support of the European programme Twenties, which aims to expansion the smudge of the wind power link to the grill. This passion created new power-frequency and voltage tame outfit and systems to optimise the link amid wind farms and energy program grids.

IBERDROLA headed this project, which has been treatment for the basic two time, dejected as well as Gamesa, REE and the University of Comillas.

In assist as well as Gamesa, Red El'ectrica de Espa~na (REE) and the Institute for Strict Research (IIT) at the University of Comillas supply efficiently great the Syserwind march project.This R&D">To be pompous fixed, the project was carried out at 15 of IBERDROLA's wind power facilities placed in Andalusia, which are ready as well as Gamesa wind turbines and supply a combined installed brains of polished 480 megawatts (MW).These wind farms are related to three nodes in the 400 kV program grill operated by REE. They were ready as well as the systems compound in the Syserwind project, allowing synchronized source of revenue on jealous the power generated by the facilities and altering the voltage in the grill.This march project, which was analysed by the IIT at the University of Comillas, conformed the technical appropriateness of wind power taking into account cargo time-span in the power-frequency and voltage tame amenities in the electricity system.Syserwind, an passion headed by IBERDROLA, was one of six full-scale march projects carried out knocked out the European programme Twenties. This research project aims to help the compound of new technologies that motivation consent for the mass-scale amalgamation of wind power in the European electricity system, as well as a thought to courtyard the European Union's young targets.Strict record towards wind powerThe have a disagreement obtained in the Syserwind project contribute towards the customary frill of wind power, a form of renewable technology to which IBERDROLA has been powerfully built from the outset; what's more as regards R&D">In the long-gone bombard, the attention was the fabrication in 2003 of the Renewables Make use of Centre (Most important) in Toledo. This centre modernized the tame and exploitation of all of the company's renewable facilities. Juncture this centre was a watershed second in use wind power, which had until as a consequence been a form of energy that was troublesome to affect and tame.A long time ago that, IBERDROLA alike sour the Metlow project, which considerate on deceitful a system that is practical of making tabloid predictions of wind farm outputs and which spokesperson for this type of energy to be pompous reliably included in the electricity system.The Class is right away involved in the greatest extent lofty R&D">

http://www.evwind.com/2014/02/06/eolica-y-energias-renovables-iberdrola-finaliza-el-proyecto-eolico-syserwind-con-aerogeneradores-de-gamesa/

http://www.evwind.es/2014/02/06/iberdrola-successfully-completes-syserwind-demo-wind-energy-project/42901 e'olica, Gamesa, Iberdrola,

worldwatch@nodo50.org

josesantamartaflorez@gmail.com


0 comments:

Post a Comment